So the regional trains (2 at different times) were canceled due to construction. Yet the TGV just stopped at one of the stations that was under construction. Two of the platforms were closed, but it looked like a couple were still open (since we just stopped at one).
Author: Ed Hovorka
TGV the right choice
TGV, much more comfortable than a bus.
No visiting Geneva
So much for seeing Geneva. We arrived at the main train station to discover the train we wanted to Lyon was cancelled. It was replaced by a bus, which takes 2.5 hours. No thanks. Sprung for the TGV, 1.5 hour ride, but we need to leave right away.
Chamonix wrapup
Tomorrow is another long travel day. We leave here between 8 and 9am by shuttle van back to Geneva Switzerland, where we’ll get dropped off at the airport. We’ll then take the subway to the city center, have lunch and take a quick look around, and figure out how to get to Arles France. There are many options, but we are shooting for the 1pm train to Lyon then another train direct to Arles. Should be in Arles around 6. If we miss either of those, it will require more transfers.
Language
So far, language has not been an issue, unless I ask a question that doesn’t get a yes or no answer. In Italy, I asked someone in Italian where I could find the bus to the airport. They gave what seemed like a 5 sentence answer in Italian. When I stared at them with a dumb look on my face, they said in English, ‘over there, to the left’. I’m limited to ordering food and asking for the bill, with ‘please’ and ‘thank you’.